Where do Mambourin builds go wrong most often?
At the slab edge. We have recorded slabs sitting more than 20mm past the frame and honeycombing along the edge at frame stage, and a vapour barrier stopping short of the beams before a pour.
Is it fine to pick and choose stages on a Mambourin build?
Yes. Each stage is booked on its own. If you choose only a few, make them slab pre-pour, frame and pre-handover.
What is left out of a stage inspection?
Engineering certification, energising or testing electrical and plumbing services, pressure testing and anything already covered when we arrive. We report what is visible on the day.