The final inspection before you accept the house. Anything recorded now is the builder's to fix under the contract, so it pays to be thorough.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
Mambourin handovers have produced roof cappings screwed through the top, tiling left unfinished, exhaust ducts loose from their cowls and render bridging control joints, alongside the usual paint and plaster items.


Annotated findings from Pre-handover (PCI) inspections.




1Bored piersOnce the piers are drilled and caged, before a drop of concrete
2Slab pre-pourThe day before the pour, while pods, steel and membrane are still on show
3FrameWhen the frame and trusses are standing and the roof is on, before wrap and cladding
4Lock-up (pre-plaster)With roof, windows, cladding and outside doors fitted, before insulation is covered
5FixingWhen doors, mouldings and cabinets are in and the painter has not started
6WaterproofingAfter the membrane cures and before the first tile is laidInstant online pricing, or talk to the booking team on 1300 471 805.
Talk to the builder about the list first. Once you accept the house your leverage drops.
Where it is safe. Otherwise we inspect from a ladder, the roof space or by drone.
No. We note visible issues, but testing and commissioning belong to the licensed trades.
Two to three hours for most Mambourin homes, longer for double storey.
It is issued by your building surveyor and confirms the house is suitable to occupy. It is not a quality check of finishes.
Yes. We can return before settlement and tick off the original list item by item.