Fixing stage inspection in Mambourin

Doors, architraves, skirtings and cabinets are fitted and the walls are lined. What we find now is fixed before paint seals it in.

  • When doors, mouldings and cabinets are in and the painter has not started
  • 1 to 2 hours on site
  • Report within 24 hours
Price your inspectionLeave your details and an inspector will ring you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage5 of 7
When to bookWhen doors, mouldings and cabinets are in and the painter has not started
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the VBA Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Mambourin fixing inspection

  • Plasterboard joints, flushing and finish level in natural light
  • Wall flatness against the 5 mm over 1.8 m tolerance
  • Cornices, architraves and skirtings
  • Door fit, hardware, hinges and closing action
  • Door and window reveals and gaps
  • Cabinetry level and alignment, doors and drawers
  • Benchtop joins, edges and splashback junctions
  • Tiling set-out, lippage and grout where laid
  • Staircase, balustrade and handrail fixing
  • Wardrobe and linen shelving installation
  • Skirting and floor junctions before floor coverings
  • Items to raise with the site supervisor before paint
Why it matters here

Fixing inspections on Mambourin builds

At a Mambourin fixing inspection we recorded an unsealed roof penetration, a wall bowed beyond the 5mm limit, damaged anti-ponding board at the eaves and no temporary downpipes, so water was pooling against the slab.

What we find at this stage in Mambourin

  • Roof penetrations not sealed
  • Walls bowed beyond tolerance
  • Anti-ponding board damaged
  • Temporary downpipes missing
  • Plaster damage awaiting patching
  • Strip drain set unevenly
Garage strip drain bedded unevenly, so water can sit in the channel, found during a fixing inspection in Mambourin
Garage strip drain bedded unevenly, so water can sit in the channel
Damaged plaster needing patching and sanding before the painter starts, found during a fixing inspection in Mambourin
Damaged plaster needing patching and sanding before the painter starts
Sample findings

Sample defects found during our fixing inspections in Mambourin

Annotated findings from Fixing inspections.

Roof penetration left unsealed, a likely entry point for rainwater, found during a fixing inspection in Mambourin
Roof penetration left unsealed, a likely entry point for rainwater
Wall bowing by more than 5mm under a 1.8m straight edge, found during a fixing inspection in Mambourin
Wall bowing by more than 5mm under a 1.8m straight edge
Damaged sarking and anti-ponding board at the eaves, to repair once scaffold comes down, found during a fixing inspection in Mambourin
Damaged sarking and anti-ponding board at the eaves, to repair once scaffold comes down
No temporary downpipes, so roof water was pooling around the slab, found during a fixing inspection in Mambourin
No temporary downpipes, so roof water was pooling around the slab

The other stages of a Mambourin build

  1. Bored piers inspection in Mambourin1Bored piersOnce the piers are drilled and caged, before a drop of concrete
  2. Slab pre-pour inspection in Mambourin2Slab pre-pourThe day before the pour, while pods, steel and membrane are still on show
  3. Frame inspection in Mambourin3FrameWhen the frame and trusses are standing and the roof is on, before wrap and cladding
  4. Lock-up (pre-plaster) inspection in Mambourin4Lock-up (pre-plaster)With roof, windows, cladding and outside doors fitted, before insulation is covered
  5. Waterproofing inspection in Mambourin6WaterproofingAfter the membrane cures and before the first tile is laid
  6. Pre-handover (PCI) inspection in Mambourin7Pre-handover (PCI)About a week ahead of the practical completion date

All construction stage inspections in Mambourin →

Guides

Construction stage guides for Mambourin

All guides →

Book a fixing inspection in Mambourin

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Mambourin: common questions

What tolerance applies to a bowed wall?

The Guide to Standards and Tolerances 2015 treats a wall as defective if it bows more than 5mm under a 1.8m straight edge.

Why do temporary downpipes matter?

Without them, roof water lands beside the slab during the build, wetting the reactive clay under the edge.

Is the roof still checked at fixing?

Yes. Penetrations, sarking at the eaves and flashings are looked at while scaffold may still give access.

Are doors, architraves and joinery looked at during fixing?

Fit, gaps and damage, against the tolerances guide.

Is painting quality checked?

Not yet, because painting has not started. That is part of the handover inspection.

Can fixing and waterproofing be one visit?

Often, yes, if the membrane is still visible when fixing is complete.

CallGet a Free Quote